Free Tool — No Signup Required

Can I Build an ADU? Free ADU Eligibility Checker

Can you build an ADU on your property? Real eligibility check in seconds.

State ADU law, zoning, lot size, and flood data — checked against your specific address. Not a generic guess.

Free · No signup · Instant results · All 50 states

ADU Eligibility Check
Can I build an ADU at 2418 Alder Ave, Sacramento, CA?
ADU Likely Allowed

2418 Alder Ave, Sacramento, CA

1,200 sqft max
State law
CA · AB 68 — by-right mandate
Zoning
R-1 · ADU-compatible
Lot size
6,500 sqft · Adequate
Allowed types
Detached · Attached · Conversion · JADU

California density stack: up to 6 units

Baseline AB 68 (3 units) + SB 9 duplex + urban lot split pathways. Verify SFHA and fire-zone exclusions before relying on the maximum.

The full Buildability™ Report adds your parcel’s zoning record (height, FAR, coverage), hazard breakdown, and value context — one Geo credit, from $29. Setbacks come from your city’s municipal code; we link you straight to it.

Sample result

Your parcel. Your verdict.

Illustrative preview — the live tool renders your address.

  • State ADU law

    By-right mandates in CA, OR, WA, CO, VT, ME, CT, MT, and NH — applied to your specific address.

  • Zoning compatibility

    Your zone code checked for ADU allowance, not a statewide generalization.

  • Lot size & existing structures

    Live parcel data — lot size and existing structure size — from county records.

  • Flood check

    FEMA flood data flags elevation requirements before you design.

Four ways in

Allowed unit types,decoded.

Detached

A standalone backyard cottage — new construction, up to 1,200 sqft in California.

Attached

An addition that shares a wall with the primary home, typically capped at a share of its size.

Conversion

Garage conversions are the most affordable path at $90,000–$180,000.

JADU

A Junior ADU within the existing home footprint, typically capped at 500 sqft.

How it works

A real verdict from your actual parcel data

01

Enter your property address

Type any U.S. property address. We pull live parcel data — zoning code, lot size, existing structure size — from county records.

02

Get a real eligibility verdict

State ADU law, zoning compatibility, lot size, and flood data are checked against your specific address. Not a generic guess.

03

See your ADU options

Review the state law tier, max ADU size estimate, allowed unit types (detached, attached, conversion, JADU), and risk flags — with next steps.

6
units possible on one CA lot
1,200
sqft max detached ADU · CA
60
days max permit review · CA
9
states with by-right mandates
FAQ

Frequently asked questions

Can I build an ADU on my property?

ADU eligibility depends on your zoning designation, lot size, state law, and local ordinances. Several states (California, Oregon, Washington, Colorado, Vermont, Maine, Connecticut, Montana, New Hampshire) now require municipalities to allow ADUs by-right on residential lots. Enter your address above for a state-specific eligibility check.

What is an ADU?

An ADU (Accessory Dwelling Unit) is a secondary housing unit on a single-family residential lot. Also called granny flats, in-law suites, or backyard cottages. ADUs can be detached, attached, converted from existing space like a garage, or built within the primary home as a Junior ADU (JADU).

How much does an ADU cost to build?

ADU construction costs typically range from $150,000-$350,000+ depending on size, location, and whether it is detached new construction, attached addition, or garage conversion. Prefab ADUs can start around $100,000-$200,000. Garage conversions are the most affordable option at $90,000-$180,000. Building in a flood zone adds $15,000-$50,000 for elevation requirements.

What states require cities to allow ADUs?

As of 2025: California (AB 68), Oregon (SB 1051), Washington (HB 1337), Colorado (HB 24-1152), Vermont (Act 47), Maine (LD 2003), Connecticut (PA 21-29), Montana (SB 528), and New Hampshire (RSA 674:71). Massachusetts (Aug 2024) allows by-right on most single-family lots. Arizona requires it for cities ≥75,000 (HB 2720, eff 2025).

How many ADUs can I build in California (SB 9 / SB 1123)?

California stacks four statutes on a single residential parcel. Baseline (AB 68/881/SB 13): 1 primary + 1 ADU + 1 JADU = 3 units. SB 9 duplex by-right adds a second primary unit → 4 units. SB 9 urban lot split (lot ≥2,400 sqft, 60/40 split max) bisects the parcel — each new lot can hold a duplex + ADU, taking the stack to 6 units. SB 1123 (effective July 1, 2025) extends ministerial lot splits to vacant single-family lots in metropolitan counties and removes the SB 9 owner-occupancy affidavit, enabling up to 10 units. Lot-split rights are blocked in SFHA, very-high fire severity zones, prime farmland, wetlands, and historic districts. The free checker computes the maximum stack for your specific parcel.

What is the maximum ADU size allowed?

Maximum ADU size varies by state: California 1,200 sqft detached, Oregon 900 sqft or 75% of primary, Washington 1,000 sqft, Colorado 1,000 sqft. Most other states default to 800-1,200 sqft. JADUs are typically capped at 500 sqft within the existing home footprint.

Can my HOA prevent me from building an ADU?

In California (AB 670) and Oregon, HOAs cannot unreasonably restrict ADU construction on single-family lots. Other state mandate laws do not explicitly override HOA covenants. Outside mandate states, HOAs typically retain veto power. Check your CC&Rs and state law.

Do I need to live on the property to build an ADU?

Owner-occupancy requirements have been eliminated in most ADU-mandate states. California, Oregon, Washington, Colorado, Vermont, Maine, Connecticut, Montana, and Massachusetts (2024) do not require owner-occupancy. New Hampshire still permits towns to require it. Most local-control states still allow owner-occupancy mandates.

How long does it take to build an ADU?

Total ADU timeline from design to occupancy is typically 12-18 months. Permitting takes 2-6 months depending on jurisdiction (60 days max in California). Construction takes 6-12 months for detached ADUs, 4-8 months for garage conversions, and 3-6 months for prefab units.

Can I rent out my ADU?

Yes. In most jurisdictions, ADUs can be rented as long-term rentals. Some cities also allow short-term rentals (Airbnb), but many states (CA, OR) restrict ADU short-term use. Rental income from ADUs typically ranges from $1,000-$3,000/month depending on market and size.

Does this checker actually use my address data?

Yes. We pull live parcel data (zoning code, lot size, existing structure size) from county records via Regrid, FEMA flood zone data from official sources, and apply state-specific ADU law to your actual address. The verdict reflects your specific lot — not a generic answer.

Want the full picture?

9 weighted factors · Zoning, flood, seismic, soil, radon, wildfire, utilities, terrain, and lot geometry — for any U.S. address.

Get full Buildability™ Report — free

Free · No signup · Results in seconds