1. Zoning
  2. Appleton, WI
  3. R-1B

Appleton, WI · zoning record

R-1B zoning in Appleton.

The dimensional standards that govern what you can build in the R-1B district, straight from Appleton's ordinance, with every figure quoting its source. Check a specific address to see how these rules apply to a real lot.

Free · Every figure cited · Read from the current code (2026-10-03)

R-1B dimensional standards.

These are the letter-of-the-law limits for the base R-1B district. Overlays (historic, neighborhood plan, and similar) can tighten them; a specific address check resolves the overlays that actually apply.

Maximum height

35 ft

How tall the building may be.

“(7) Maximum building height. Thirty-five (35) feet.”Sec. 23-93. R-1B single-family district. › 23-93 · Appleton code · read 2026-10-03

Minimum lot size

6,000 sf

Smallest conforming lot.

“(1) Minimum lot area. Six thousand (6,000) square feet.”Sec. 23-93. R-1B single-family district. › 23-93 · Appleton code · read 2026-10-03

Minimum lot width

50 ft

Narrowest conforming lot.

“(3) Minimum lot width. Fifty (50) feet.”Sec. 23-93. R-1B single-family district. › 23-93 · Appleton code · read 2026-10-03

Interior side setback

6 ft

Required space from a side line.

“(6) Minimum side yard. Six (6) feet.”Sec. 23-93. R-1B single-family district. › 23-93 · Appleton code · read 2026-10-03

Rear setback

25 ft

Required space from the rear line.

“(5) Minimum rear yard. Twenty-five (25) feet.”Sec. 23-93. R-1B single-family district. › 23-93 · Appleton code · read 2026-10-03

Maximum building coverage

50 %

Share of the lot the building footprint may cover.

“(2) Maximum lot coverage. Fifty percent (50%).”Sec. 23-93. R-1B single-family district. › 23-93 · Appleton code · read 2026-10-03

Sources

Every figure above is quoted verbatim from the current ordinance. We never substitute a typical-for-zone default: a field absent from the record shows nothing, not a guess.

Other Appleton districts on record.

Check a real Appleton lot against R-1B.

See how these standards resolve on a specific parcel, with the overlays that actually apply, in about 20 seconds.

Free to score · No card, no signup · All 50 states