1. Zoning
  2. New Orleans, LA
  3. HU-RM2

New Orleans, LA · zoning record

HU-RM2 zoning in New Orleans.

The dimensional standards that govern what you can build in the HU-RM2 district, straight from New Orleans's ordinance, with every figure quoting its source. Check a specific address to see how these rules apply to a real lot.

Free · Every figure cited · Read from the current code (2026-10-02)

HU-RM2 dimensional standards.

These are the letter-of-the-law limits for the base HU-RM2 district. Overlays (historic, neighborhood plan, and similar) can tighten them; a specific address check resolves the overlays that actually apply.

Minimum lot depth

90 ft

Shallowest conforming lot.

“ | MINIMUM LOT DEPTH | 90’ | 90’ | 90’ | 90’ | 90’”Table 11-2A: Residential Districts Bulk & Yard Regulations › BULK REGULATIONS › MINIMUM LOT DEPTH › HU-RM2 column · New Orleans code · read 2026-10-02

Rear setback

20 ft

Required space from the rear line.

“F | REAR YARD | 20% of lot depth or 20’, whichever is less | 20% of lot depth or 15’, whichever is less | 20% of lot depth or 15’, whichever is less | SF & 2F: 20% of lot depth or 15’, whichever is less Townhouse, MF & Non-Residential: 2…”Table 11-2A: Residential Districts Bulk & Yard Regulations › MINIMUM YARD REQUIREMENTS › F REAR YARD › HU-RM2 column · New Orleans code · read 2026-10-02

Sources

Every figure above is quoted verbatim from the current ordinance. We never substitute a typical-for-zone default: a field absent from the record shows nothing, not a guess.

Check a real New Orleans lot against HU-RM2.

See how these standards resolve on a specific parcel, with the overlays that actually apply, in about 20 seconds.

Free to score · No card, no signup · All 50 states