Minimum lot width
25 ftNarrowest conforming lot.
“Lot Width (ft) 25 25 25 25 18”Table 131-04F Development Regulations for RT Zones › Min Lot D imensions › Lot Width (ft) › RT-1-1 column · San Diego code · read 2026-10-02
San Diego, CA · zoning record
The dimensional standards that govern what you can build in the RT-1-1 district, straight from San Diego's ordinance, with every figure quoting its source. Check a specific address to see how these rules apply to a real lot.
Free · Every figure cited · Read from the current code (2026-10-02)
These are the letter-of-the-law limits for the base RT-1-1 district. Overlays (historic, neighborhood plan, and similar) can tighten them; a specific address check resolves the overlays that actually apply.
Narrowest conforming lot.
“Lot Width (ft) 25 25 25 25 18”Table 131-04F Development Regulations for RT Zones › Min Lot D imensions › Lot Width (ft) › RT-1-1 column · San Diego code · read 2026-10-02
Shallowest conforming lot.
“Lot Depth (ft) 100 100 90 80 80”Table 131-04F Development Regulations for RT Zones › Min Lot D imensions › Lot Depth (ft) › RT-1-1 column · San Diego code · read 2026-10-02
Required space from the front line.
“Min Front Setback (ft) 5 5 5 5 5”Table 131-04F Development Regulations for RT Zones › Setback R equirements › Min Front Setback (ft) › RT-1-1 column · San Diego code · read 2026-10-02
Required space from a side line.
“Side Setback (ft) 0 0 0 0 0”Table 131-04F Development Regulations for RT Zones › Setback R equirements › Side Setback (ft) › RT-1-1 column · San Diego code · read 2026-10-02
Required space from a side street on a corner lot.
“Min Street Side Setback (ft) 5 5 5 5 5”Table 131-04F Development Regulations for RT Zones › Min Street Side Setback (ft) › RT-1-1 column · San Diego code · read 2026-10-02
Required space from the rear line.
“Min Rear Setback (ft) 3 3 3 3 3”Table 131-04F Development Regulations for RT Zones › Min Rear Setback (ft) › RT-1-1 column · San Diego code · read 2026-10-02
Every figure above is quoted verbatim from the current ordinance. We never substitute a typical-for-zone default: a field absent from the record shows nothing, not a guess.
See how these standards resolve on a specific parcel, with the overlays that actually apply, in about 20 seconds.
Free to score · No card, no signup · All 50 states