1. Zoning
  2. Tracy, CA
  3. MDR

Tracy, CA · zoning record

MDR zoning in Tracy.

The dimensional standards that govern what you can build in the MDR district, straight from Tracy's ordinance, with every figure quoting its source. Check a specific address to see how these rules apply to a real lot.

Free · Every figure cited · Read from the current code (2026-10-02)

MDR dimensional standards.

These are the letter-of-the-law limits for the base MDR district. Overlays (historic, neighborhood plan, and similar) can tighten them; a specific address check resolves the overlays that actually apply.

Maximum building coverage

65 %

Share of the lot the building footprint may cover.

“The maximum aggregate coverage of all buildings in the MDR Zone shall not exceed sixty-five (65%) percent of the lot.”• Article 9. - Medium Density Residential Zone (MDR) › 10.08.1440 · Tracy code · read 2026-10-02

Sources

Every figure above is quoted verbatim from the current ordinance. We never substitute a typical-for-zone default: a field absent from the record shows nothing, not a guess.

Other Tracy districts on record.

Check a real Tracy lot against MDR.

See how these standards resolve on a specific parcel, with the overlays that actually apply, in about 20 seconds.

Free to score · No card, no signup · All 50 states