Maximum height
35 ftHow tall the building may be.
“11C-1705 Height Regulations. No building shall be erected to a height greater than 35 feet.”§ 11C-1705 · Garden City code · read 2026-07-18
The dimensional standards that govern what you can build in the BD district — straight from Garden City's ordinance, with every figure quoting its source. Check a specific address to see how these rules apply to a real lot.
Free · Every figure cited · Read from the current code (2026-07-18)
These are the letter-of-the-law limits for the base BD district. Overlays (historic, neighborhood plan, and similar) can tighten them; a specific address check resolves the overlays that actually apply.
How tall the building may be.
“11C-1705 Height Regulations. No building shall be erected to a height greater than 35 feet.”§ 11C-1705 · Garden City code · read 2026-07-18
Smallest conforming lot.
“11C-1706 Area, Width and Setback Regulations. Minimum Setbacks (in feet) District Area in Square Feet Front Side Rear BD 7,500 30 8 & 10 30 · 7500 sq. ft. or less* 25 8 & 10 25 · *Lots 7500 sq. ft. or less cannot be split”§ 11C-1706 · Garden City code · read 2026-07-18
Required space from the front line.
“11C-1706 Area, Width and Setback Regulations. Minimum Setbacks (in feet) District Area in Square Feet Front Side Rear BD 7,500 30 8 & 10 30 · 7500 sq. ft. or less* 25 8 & 10 25 · *Lots 7500 sq. ft. or less cannot be split”§ 11C-1706 · Garden City code · read 2026-07-18
Required space from the rear line.
“11C-1706 Area, Width and Setback Regulations. Minimum Setbacks (in feet) District Area in Square Feet Front Side Rear BD 7,500 30 8 & 10 30 · 7500 sq. ft. or less* 25 8 & 10 25 · *Lots 7500 sq. ft. or less cannot be split”§ 11C-1706 · Garden City code · read 2026-07-18
Every figure above is quoted verbatim from the current ordinance. We never substitute a typical-for-zone default: a field absent from the record shows nothing, not a guess.
Informational only — not a permit, appraisal, or professional engineering opinion. Verify with your local planning department before acting on it. See Terms and data sources.
See how these standards resolve on a specific parcel — with the overlays that actually apply, in about 20 seconds.
Score an address