DocsData & methodology

Accuracy & limits

Buildability reads public records. Records can be wrong or out of date. Verify before you act.

What a finding means

Each finding states what the record says, at the resolution the record has. Read them that way:

FindingEstablishesDoes not establish
Flood zoneWhat FEMA’s published map shows for the lotA survey or an elevation certificate; unmapped flood risk
WetlandThat the National Wetlands Inventory maps one hereA wetland delineation; jurisdictional status
SlopeGround slope from USGS elevation data at the lotGrading cost or a geotechnical finding
Soil ratingsThe survey’s rating for the mapped soil unitWhat a test pit or perc test will find on this lot
UtilitiesRoads and power lines mapped nearbyCapacity, a right to connect, or connection cost
Water serviceWhether a community water system’s boundary covers the pointWhether the system will serve this lot
Road frontageThat the outline meets a mapped roadLegal access, which is a title question
Zoning standardsWhat the quoted section of the ordinance saysVariances, pending amendments, or an official determination
Radon, seismicThe regional or county ratingA reading at this lot
Value and rentAn automated estimate from comparable recordsAn appraisal

Where the record is thin

  • Zoning standards exist only where the Atlas has read the district. Elsewhere the report names the district and says the standards aren’t read yet.
  • Rural and unincorporated land often has no zoning layer, coarser parcel data and fewer comparable sales.
  • Overlays (historic districts, special plans) can change what a district allows. The report flags the ones on record; it can’t promise it has every one.
  • Timing: agencies publish on their own schedule, so a recent rezoning or map revision can take weeks to appear. Every finding shows its read date.

How the Score has been tested

The Score has been backtested against what actually got built in Austin, Texas: lots that were built on against lots that never were. That is one metro and mostly one build type, and the methodology has changed since. Treat the Score as a ranking of how much the record stands in the way, not a prediction that a permit will be issued. The Accuracy page has the study.

Before you act

  1. Confirm the zoning with the city or county’s zoning office. A zoning verification letter is the official answer.
  2. Order a survey if lot lines, easements or encroachments matter.
  3. Get a title report for access, easements and restrictions.
  4. Ask the utilities about capacity and connection.
  5. Commission soil or geotechnical tests where the report flags a soil limitation.

Buildability is preliminary information. It is not legal advice, an entitlement, a permit, an appraisal, an engineering opinion or an official zoning determination.

Didn’t find it? The Help Center answers account and billing questions, and Geo answers questions about a specific parcel inside the app.